Ericsson Field Services and
Operations Technician
Apex Systems
April 2015 – Present (3 months)
St. Cloud, Minnesota Area/
Des Moines Iowa
• Field engineer and trainer for
AT&T and Sprint
• Alarms lead and Tower Crew
support.
• Network integration and
development
• Diagnose and troubleshoot all
systems in MMBS and battery cabinets
• Trainer of field engineers,
construction managers for OCI, EMS and Black & Veatch markets
• Proficient in alarms,
integration, fiber installation, ATP testing, and commissioning
• Support CM’s and tower crews to
resolve radio issues (RSSI-VSWR and TX Power) Fiber issues.
• Integration and commissioning,
trouble shooting 800, 1900 LTE and 2.5 equipment.
GCB Services :DRIVE TESTER
Engineer
March 2015 – April 2015 (2
months) Asheville, North Carolina Area
Specialties: Data collection and
post processing, RF analysis, troubleshooting, device calibrations,
software builds, customer service, and Site surveys.
ADEX CORP for Ericsson/ Sprint
Field Engineer
July 2014 - October 2014
· Working on the Sprint 65MHz Project and 2.5 GW in the
greater Miami/Fort Lauderdale
area
· Complete the Ericsson/Sprint cabinet conversion from a GEN1
to a GEN2 configuration
· Act as a Field Engineer to coordinate personal and schedules
for Hardware and software installation and optimization of Ericsson Base
Transceiver Stations - BTS and network equipment.
· Upgrade Ericsson/Sprint power as needed
· Take Inventory of forward and reverse hardware.
· Complete SRS voice and data call testing after
successful installation of new equipment
· Install, configure and trouble shoot as needed
· Take photographs and complete close out packages
· Keep accurate records of scanned items
· Load and configure Sprint SP210 router and CDMA/LTE/GSM/EVDO
equipment
· Configuration BTS IP/Antenna setting base on site design.
· Works with 800 MHZ 1900 MGHZ 65MHZ
World Link - Samsung – Sprint
Sr. IMP Engineer October 2013 –
July 2014
· Working to expand Sprints 3G CDMA, 4G LTE and 2.5 Networks
· Load and configure Cisco ASR901 Router, 3G CIMA, 4G UAMA,
and L9 Cards
· Install, configure and trouble shoot Sprints Spark 2.5
equipment
· Connect both fiber and T1 connections and trouble shoot
related problems
· Work with other employees and groups to isolate and repair
communications issues
· Troubleshooting Multi Mode Base Station (MMBS) and Battery
Backup Unit (BBU) cabinets and 800MHz, 1.9GHz RRH heads Eltec rectifiers
configurations.
· Perform inspections on installed equipment and make needed
corrections
· Test both voice and data network connections (ATP)
· Connect to and trouble shoot problems with Dragonwave
backhaul equipment
· Clear alarms and trouble shoot problems from NIU up to
Antenna on above equipment
· Configure PowerSuite 3.3 FlatPack power equipment
· Works with 3G 800 MHZ, 1900 MHZ Samsung MMBS/BBU
Scarlet Wireless
April 2013 –September 2013
Commissioning Integration Field
Technician
T-Mobile Ericsson Multi Standards
Modernization:
Troubleshooting/Integrator/Commission/Installation
T-Mobile Types of cabinets.
Provided technical support and
guidance to field members on complex project related issues.
Configured various networking
core equipment (Lucent 4 Electronic Switching System, Lucent 5ESS and
Nortel Digital Multiplex System 250)
Performed advanced installation
and integration of RBS 3106, 3206, 6102, 6201 including all technologies
such as LMU, CSR, GSM (DUG), UMTS (DUW), and LTE (DUL) in different
configurations (i.e. 4A, 4AV2, 2C, 3B, Hybrid).
Highly skilled in troubleshooting
and understanding BTS alarms including RF and antenna issues.
Performing module upgrade like
OBIF,TX,RX board to RBS 3000
Installation of fiber Optic,
manual splicing and OTDR testing
Installation of Radio, RRUS,RRUW,
2600mhz, 2100mhz, 1900mhz, 850mhz
Perform installation of IBS and
testing.
Working with WCDMA/GSM/UMTS, RBS
2106/3106/3206/3418/3518/6102/6131/6601.
Modernization project: 4A/4B,
3A/3B, 2C 4A/4B: Solution,Rip and Replace GSM cabinet and replace with
RBS6102. Cutover 2G (DUG), Integrate PCS (DUW). 3A/3B: RRUS Solutions.
T-Mobile Modernization Project -
installation work and integration of modern Ericsson nodes providing GSM,
UMTS and LTE service from Nortel or RBS3000 series to RBS6000. All
configurations including the latest TMO such as 2C, 3A/B, 4A/B and mopping,
Power upgrades from 3106 convert
to 6131 cabinet. 2C: AIR antenna Solutions, Commissioning and Integration,
CBU to DUW upgrade, PBC6500 power upgrade. ALU 7705 project: Installing
Alcatel lucent SAR-F router in GSM/UMST cabinet 3106/3206 with power, prep
Ethernet cable with JDSU, commission 7705 router base on script generated
by switch, prep LMU cable to True Position unit, run T1’s to GSM cabinets.
Installation of Lucent 4.0B Node B cabinets
AAV project: Installing JDSU
(NID) with power, prep RJ45 cable with Ciena.
Call switch to create script base
on site specifications. DUW30 project: Installing DUW30 in UMTS cabinet,
scratch loading, FTP new Basic package, executing Upgrade package,
executing scripts base on site specifics, and on air within maintenance
window. 1st and 2nd Carriers Added UMTS, RBS 3106/3206. Provide technical
group supports for software and hardware upgrade integration of T-Mobile
Cell Site. Tools and Equipment required such as; Java down load, EMAS, FTP,
Hyper-terminal or serial boot screen, personal telecom tools and special
equipment if required. Scratch load: Basic package W10, Upgrade package,
Scripts files and Configuration CV. Troubleshooting HW issued when 2nd
Carrier add scripts loaded and Rollback such as; review all alarms list if
there are any critical alarms that impact traffic, Digital Subrack boards,
RU, FU and verified cables connection. Installing and maintain Ericsson
wireless field equipment.
T-Mobile modernization install
and integration’s. Metro PCS rbs installs and LTE integration's
Installation and Integration of
DUW30 & XCU Ericsson Equipment in the 3201 series cabinets for T_MOBILE
Using DAM Tools to schedule
sites, and log work details. Performing all call and data test and
troubleshooting on Site. Used Element manger and Filezilla wftp programs to
upgrade software.
Adecco Engineering and Technical,
Brooklyn, NY
November 2012 – February 2013
Field Technician
Repairing, installing and the
replacing home Appliances for G.E
Changing the parts or replacing
unit and updating software, make sure the home Appliances are work safely
Field Technician (Contractor) for
Comcast/Charter
Solutelia, LLC — Denver,
CO
February 2012 to October 2012
Integration Technician
Contractor on a Motorola project,
Completing integration for new Motorola 4812 frames into existing cellular
network and completion of calibration testing within the maintenance
window. This also includes any installation that needs to be completed,
wire wrapping and cross connecting of DSX blocks using Telco color code.
Working with MTSO on site configuration, troubleshooting any issues that
might arise while integration is in progress and completing a daily
activity report of the nights work.
TechUSA — Charlotte,
NC
March 2011 - February 2012
Integration Technician
Contractor on a NSN expansion
project. Responsible for integration of Motorola UBS and 4812 frames into
existing cellular network by completing calibration and testing for turn
up. This also includes any installation that needs to be completed. Any
wire wrapping or cross connecting of DSX blocks following Telco standards.
I have also set up T1 routers for INIT, worked with MTSO on site
configuration and troubleshooting any issues that might arise while
integration is in progress. I also trained lower level technicians taking
them under my wing and assisting them with resolving issues they may run
into on a day to day basis. I was also involved with troubleshooting any
issues that would arise after sites were handed over to customer and
completing a daily activity report.
Field Technician (Contractor) for
Comcast/Charter
360VisionCommunications
Inc.
February 2008 – December 2010
Comcast/Charter, Stone Mountain,
GA
Field Technician
Reviewing the network details and
the overall arrangement of the house of the client
Perform installation of network
cabling systems including, coax, CAT5, CAT5E, CAT6, OSP, and fiber cables.
Terminate cable ends to RJ-45
modular jacks, patch panels, 110 blocks, etc.
Demo old cabling systems in
preparation for new cabling systems.
Using intelligent switches for
cable installations involving two or more television sets
Interacting with the clients and
informing about the precautions with the cable networks
Field Technician
Advanced Cable, Alpharetta, GA
August 2006 – January /2008
Install/Service Comcast Digital
Video/ Voice & Data Equipment to spec per customer.
Deliver Customer satisfaction and
installing wiring and detailing information onto the products.
11/2004 – 11/2005
Dish Network, Brooklyn, NY
Field Technician Satellite/Dish
Network
Install/Service Satellite Antenna
& Digital Video Equipment to spec per customer
Deliver Customer Satisfaction w/
installation of wiring & detail information on products
Install/Service Optimum Digital